HAMPs

COLAS CZ operates 13 modern and powerful hot asphalt mixing plants for production of asphalt mixtures. Our dense network of production plants enables us to supply building sites throughout the Czech Republic.

  1. HAMP Bašnice in Jičín district,
  2. HAMP Bradlec in Mladá Boleslav district,
  3. HAMP Bystřice nad Pernštejnem in Žďár nad Sázavou district,
  4. HAMP Čenkov in Praha-východ district,
  5. HAMP Holubice in Vyškov district,
  6. HAMP Provodín in Česká Lípa district,
  7. HAMP Rančířov in Jihlava district,
  8. HAMP Sedlnice in Nový Jičín district,
  9. HAMP Soutice in Benešov district,
  10. HAMP Sudoměřice u Bechyně in Tábor district,
  11. HAMP Tasovice in Znojmo district,
  12. HAMP Valdorf in Domažlice district,
  13. HAMP Vrbice in Karlovy Vary district.

Currently, COLAS CZ mixing plants produce about 700 thousand tons of asphalt mixtures per year.

Asphalt mixtures and modified asphalts

In addition to the traditional mixtures (ACO, ACL, ACP, BBTM, SMA, PA and AKO), we also offer mixtures based on the technological rules of the Ministry of Transport CR and mixtures developed in the laboratory of the COLAS SA group in France:

High modulus asphalt mixture is a hot-processed asphalt mixture with a high rigidity modulus, with a relatively high content of harder asphalts (or additional hardening additives), low voidage for base courses and modified voidage for the sub-base courses. The application of these mixtures minimizes the occurrence of excessive permanent deformation in the form of ruts or other similar defects, thus ensuring the high resistance of asphalt layers against wear and effects of water, long life, the reduced thickness of the road compared to the classic types of modifications and higher operational efficiency of the roadway. (source: TP 151)

Asphalt mixture with increased resistance to crack spreading (SAL) – a specially designed mixture for thin or micro asphalt topping. At low temperatures, the ductility of the layer is several times higher than that of standard mixtures or materials, thus reducing the spread of cracks during the movement of the lower layer. (source: TP 147)

MICROVILLE asphalt soundproofing mixture – an asphalt mixture with 0/8 mm granularity for wearing courses in areas where it is necessary to reduce noise produced by tyres of passing vehicles. The mixture is also very resistant to effects of the traffic load, has excellent anti-skid properties and resistance to permanent deformations (it is used as a thin-layer modification).

Asphalt colour mixture COLCLAIR – This mixture is analogous to the traditional asphalt mixtures, but the standard black asphalt is replaced with Bituclair transparent binders. The mixture can be produced simply with the aggregate and binders or fibres, and the appearance follows the natural hue of the aggregate, or with added pigments. (source)

We are able to produce other mixtures to satisfy the customer's needs.

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved