Staré Bohnice 1st stage Bohnická – Ústavní – K Farkám and their vicinity, project No. 999229/1, Praha 8
Within the first stage, the roads will be reconstructed in Bohnická, Ústavní, Nové Butovice, Na Bendovce, U Pazderek, K Farkám streets and the connection between the streets K Farkám and Bohnická in Praha 8 will be executed.
Construction period: | 2017/10 - 2019/02 |
---|---|
Total value of the contract: | 41 823 059 CZK excluding VAT |
The roadway is designed with bituminous cover, increased area intersection will be cobbled, pavements then from concrete pavement and part of sidewalks at the monumental building will be made from stone cobbles. Within the contract, new sewerage system, which will be used for drainage of roads, will be set up.Drainage will be adjusted, new traffic signs and greening will be implemented.
Current state of construction: Work on rainwater sewerage is currently under way. The work is carried out by a member of the consortium: Čermák and Hrachovec.