Sadová residential complex - main roads and utility networks - section E

Section E is part of the extensive system of roadways and utility networks of the Sadová residential complex. The construction includes a basic roadway system and engineering network routes.

Construction period: 2018/04 - 2019/06
Total value of the contract: 18 990 70 CZK excluding VAT

The contract includes:

1. Roadways and paved areas
2. Drainage and sewerage sewerage
3. Water supply
4. Pipeline
5. Public lighting
6. Connections of utility networks to residential and family houses
 

As of August 2018, rough landscaping, sewerage and rainwater sewerage were realized. Rain and sewage connections are being performed.

COLAS News

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Apr 1

Change of COLAS CZ, a.s. BOD members

With effect from 1 April 2021, the statutory body of COLAS CZ, a.s. is the following company BOD.

Feb 26

COVID-19 - we respond to the current development of the pandemic

We care about the health of our employees and try to do our best to protect them as much as possible at this time!

Jan 8

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

Dec 27

COLAS CZ realizes D48 Bělotín - Nový Jičín project

ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved