Road I/69 – Vizovice, Chrastěšovská Street

Regionally important road I/69 provides a connection between Zlín and Vsetín. The reconstruction in question involves an overall length of 647 m in the town limits of Vizovice.

Construction period: 2016/04 - 2016/07
Total value of the contract: 18 088 150 CZK excluding VAT

The structural modification comprises shaving 160 mm of the bitumen layer, the laying of new surface layers; the sub-layer is cold-recycled in a thickness of 200 mm according to TC 208. The layer beneath the recycled layer is continuously supplemented with chippings of a 0-63 mm fraction.

The reconstruction includes a structural solution of road drainage by the completion or replacement of current UV. A total 24 pieces of UV were installed. During the drainage modification, the culvert was replaced with a new DN 600, the inlet and outlet were paved with quarry stone in a thickness of 350 mm with a connection directly into the new ditch block, which diverts the water parallel to the stream.

The current solution of direction and elevation is maintained; road I/69 is designed in the MS 8/50 category. The road is edged by road curbs, completed with drainage double line of granite blocks with a width of 250 mm, which also forms the guiding line for laying the new asphalt layers.

The reconstruction includes the complete reconstruction of two current bridges at the beginning and the end of the section, 6.735 m and 15.07m in length, and the supporting wall, which was in bad technical condition and which provides stability of RD in the vicinity of the road; the length of the supporting wall is 58.94 m.

New vertical and horizontal road markings were applied after the completion of the structural modifications at all sites and after the laying of new asphalt layers.

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved