Revitalization of the area - II/210 Western bypass Sokolov-Svatava (Stage III)
The II/210 road is relocated along the western edge of the city from the Chebská intersection to the Kraslická one.
Construction period: | 2015/09 - 2020/11 |
---|---|
Total value of the contract: | 144 745 140 CZK excluding VAT |
Contractor: | COLAS CZ, a.s. as a general supplier |
Construction parameters
bridge length 295 m
clear height of the bridge min. 6.45 m
bridge width 12.5 m
asphalt surface 2,654.903 m2