Repairs of class I and II road surfaces in the Moravian-Silesian Region – stage V, Repair of road surface III/4824 Kopřivnice - Lubina, stage I and II

The work involved the reconstruction of the road surface.

Construction period: 2015/09 - 2015/11
Total value of the contract: 6 482 814 CZK excluding VAT

The work included: 

  • removal of the asphalt surface 15,933 m2
  • rehabilitation of non-supportive shoulders 1,385 m2
  • geogrid for reinforcement of the asphalt surface 630 m2
  • laying of the base courses 3,065 m2
  • application of tack coat 19,773 m2 
  • laying of the asphalt wearing course 16,908 m2

Attachments

COLAS News

Jun 14

Biodiversity, the core theme of Colas Environment Day

On Thursday, June 9, Colas is holding its 2nd Environment Day across all its locations worldwide. This year, the event is dedicated to biodiversity, a major challenge for the Group, which launched a low-carbon and biodiversity strategy in 2020 to help preserve the planet.

Jun 6

Merger announcement - COLAS CZ, a.s. and Silnice Žáček, s.r.o. have merged

As of 31 May 2022, the merger of Silnice Žáček s.r.o., as the merging entity dissolved without liquidation, and COLAS CZ a.s., as the surviving entity, became effective.

Mar 16

Fiscal Year 2021 of the Group

The Board of Directors of Colas met to finalize the 2021 financial statements

Feb 23

Colas joins the #StOpE initiative to end everyday sexism in the workplace

On January 25, 2022, the Colas Group, represented by Frédéric Gardès, Chairman and CEO, joined #StOpE, an initiative dedicated to combatting so-called “everyday” sexism in the workplace. Colas is the first company in the construction sector to sign on to the program.

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved