Repair of handling area in front of a D Hangar and reconstruction of roadway between C and D Hangars
Reconstruction of the asphalt cover in the handling area in front of the D Hangar at Václav Havel Airport in Ruzyně.
Construction period: | 2018/08 - 2019/09 |
---|---|
Total value of the contract: | 13 422 748 CZK excluding VAT |
In this area there are take-offs and arrivals of IRS helicopters (integrated rescue system). The final asphalt layeris comprises a special anti-kerosene layer to prevent asphalt binder degradation due to fuel leakage during helicopter refueling.