Repair of cycle path in the A. Brože section - a loop in Bělský forest

The project concerned reconstruction of an existing cycle path in a length of approx. 320 m and a width of 4 m.

Construction period: 2015/08 - 2015/10
Total value of the contract: 1 745 298 CZK excluding VAT

The work included demolition of the existing concrete kerb and concrete troughs, installation of new concrete kerb, installation of a separation strip from interlocking pavers in a cement base and a new concrete surface in a thickness of 100 mm with scattered reinforcement. The project also involved the construction of a reinforced road with concrete surface in a thickness of 200 mm and scattered reinforcement, including sub-base layers and a concrete kerb. New connecting pavements for pedestrians and cyclists from interlocked paving were also built.

The basic areas:

  • concrete area in the thickness of 100 mm                                     1221.72 m2
  • concrete area in the thickness of 200 mm                                 184.84 m2
  • concrete kerb                                                                           921.73 m
  • interlocking pavement in cement base                              138.9 m2 
  • interlocking pavement in gravel base                                     118.8 m2

Attachments

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved