Repair of cycle path in the A. Brože section - a loop in Bělský forest

The project concerned reconstruction of an existing cycle path in a length of approx. 320 m and a width of 4 m.

Construction period: 2015/08 - 2015/10
Total value of the contract: 1 745 298 CZK excluding VAT

The work included demolition of the existing concrete kerb and concrete troughs, installation of new concrete kerb, installation of a separation strip from interlocking pavers in a cement base and a new concrete surface in a thickness of 100 mm with scattered reinforcement. The project also involved the construction of a reinforced road with concrete surface in a thickness of 200 mm and scattered reinforcement, including sub-base layers and a concrete kerb. New connecting pavements for pedestrians and cyclists from interlocked paving were also built.

The basic areas:

  • concrete area in the thickness of 100 mm                                     1221.72 m2
  • concrete area in the thickness of 200 mm                                 184.84 m2
  • concrete kerb                                                                           921.73 m
  • interlocking pavement in cement base                              138.9 m2 
  • interlocking pavement in gravel base                                     118.8 m2

Attachments

COLAS News

Jun 14

Biodiversity, the core theme of Colas Environment Day

On Thursday, June 9, Colas is holding its 2nd Environment Day across all its locations worldwide. This year, the event is dedicated to biodiversity, a major challenge for the Group, which launched a low-carbon and biodiversity strategy in 2020 to help preserve the planet.

Jun 6

Merger announcement - COLAS CZ, a.s. and Silnice Žáček, s.r.o. have merged

As of 31 May 2022, the merger of Silnice Žáček s.r.o., as the merging entity dissolved without liquidation, and COLAS CZ a.s., as the surviving entity, became effective.

Mar 16

Fiscal Year 2021 of the Group

The Board of Directors of Colas met to finalize the 2021 financial statements

Feb 23

Colas joins the #StOpE initiative to end everyday sexism in the workplace

On January 25, 2022, the Colas Group, represented by Frédéric Gardès, Chairman and CEO, joined #StOpE, an initiative dedicated to combatting so-called “everyday” sexism in the workplace. Colas is the first company in the construction sector to sign on to the program.

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.