Repair of cycle path in the A. Brože section - a loop in Bělský forest
The project concerned reconstruction of an existing cycle path in a length of approx. 320 m and a width of 4 m.
Construction period: | 2015/08 - 2015/10 |
---|---|
Total value of the contract: | 1 745 298 CZK excluding VAT |
The work included demolition of the existing concrete kerb and concrete troughs, installation of new concrete kerb, installation of a separation strip from interlocking pavers in a cement base and a new concrete surface in a thickness of 100 mm with scattered reinforcement. The project also involved the construction of a reinforced road with concrete surface in a thickness of 200 mm and scattered reinforcement, including sub-base layers and a concrete kerb. New connecting pavements for pedestrians and cyclists from interlocked paving were also built.
The basic areas:
- concrete area in the thickness of 100 mm 1221.72 m2
- concrete area in the thickness of 200 mm 184.84 m2
- concrete kerb 921.73 m
- interlocking pavement in cement base 138.9 m2
- interlocking pavement in gravel base 118.8 m2