Relocation of route II/352 Jihlava – Heroltice

Construction of a new class II, S 9,5 category road in a total length of 3 km

Construction period: 2009/04 - 2010/10
Total value of the contract: 168 769 019 excluding VAT

Construction of a new class II, S 9,5 category road in a total length of 3 km in the composition: 15 cm crusher run material, 20 cm mechanically compacted aggregate, 10 cm ACP 22S, 7 cm ACL 22+ and 4 cm of SMA 11+; the total area of the road was 33,000 m2. The construction included the relocation of O2 communication cables, HV power line, modification of the drainage on the surrounding farm land, modification of 300 meters of a stream amounting to CZK 7.7 million, installation of a central draining system DN 300 mm amounting to CZK 6.6 million, building of 70 m of a stone soundproof wall amounting to CZK 1.9 million and two tunnel-type bridges – one framed, with a clearance of 2 m amounting to CZK 1.7 million and one tubosider, with a clearance of 3.7 m amounting to CZK 5 million. Earthworks in a total volume of 67,000 m3, complete horizontal marking and traffic signs including 390 m of steel crash barrier were implemented.

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved