Reconstruction of the II/160 roadway in Rožmberk
Complete 2nd class II/160 road reconstruction at the slope of the town of Rožmberk
Construction period: | 2017/09 - 2018/09 |
---|---|
Total value of the contract: | 22 985 634 CZK excluding VAT |
The works included: removing of the existing road construction (original paved roadway covered with asphalt) and replacement by a new road construction (asphalt roadway). The reconstruction also involved the overall adjustment of the road layout (modification or completion of new pavements, parking spaces, bus stops) as well as the drainage of the ground.