Reconstruction of II/189 Draženov, roundabout - Klenčí

The project concerned reconstruction of road II/189 from the junction with route I/26 in Draženov up to the junction with route II/198 in Klenčí pod Čerchovem, in a total length of 3,726 m.

Construction period: 2015/03 - 2015/06
Total value of the contract: 22 811 278,48 CZK excluding VAT

The total area of the repaired asphalt courses in the road structure was 31,783 m2.

The roadway was milled in the whole section to a depth of 90 mm and non-supportive spots were repaired. A new ACL 22 S base course was then laid in a thickness of 70 mm and ACO 11 S in a thickness of 40 mm. The construction included repairing and cleaning of 4 culverts, the construction of 2 new culverts, surface repair of the bridge (re-pavement, grouting), reinforcement of the verges and cleaning of ditches, partial replacement of kerbs, application of new horizontal marking and installation of new roadside delineators.

COLAS News

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Sep 22

Repair of overpass over Chlumecká Street on Prague Ring Road

Two new bridges will replace obsolete overpass in eastern part of metropolis

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved