Reconstruction of AB roadway, D1 highway

Reconstruction of the highway asphalt surface with cold recycling of the subbase courses.

Construction period: 2003/05 - 2003/06
Total value of the contract: 68 745 tis. CZK

D1 km 85.140 - 89.900 on the right

The total length of 4.66 km, repair of cracks, modification of crash barriers, reconstruction of monolithic concrete trough.

COLAS News

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Sep 22

Repair of overpass over Chlumecká Street on Prague Ring Road

Two new bridges will replace obsolete overpass in eastern part of metropolis

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved