Reconstruction of 28. října St. and reconstruction of Dr. E. Beneše St., Neratovice
Reconstruction of a street space with the local repair of the whole layer system, reconstruction and creation of new pavements, entrances, parking spaces and bus bays.
Construction period: | 2013/11 - 2014/07 |
---|---|
Total value of the contract: | 18 755 462 CZK excluding VAT |
The project concerned reconstruction of a street space by strengthening of the asphalt cement road cover with the local repair of the whole system of courses, reconstruction and creation of new pavements, entrances, parking spaces and bus bays.
The work also included reconstruction of drainage, protection of utility lines, urban furniture, traffic signs and the greenery.