R10 right-hand lane Radonice – Hlavenec (stage 1), Tuřice – Benátky

The project addresses modernization of the right-hand traffic lane of the R10 expressway.

Construction period: 2018/04 - 2018/06
Total value of the contract: 71 062 753 CZK excluding VAT

The works involve:

• Reconstruction of the R10 motorway right-lane in km 9,985 - 14,375 (replacement of cover layers including remediation of base layer cracks)

• Expansion of the road at the points of extension of the branch / connecting strip according to the ČSN standards including relocation of large-area traffic signs

• Restoring traffic signs and adding safety-enhancing features

• Restoring and completing the safety device on the right edge of the road

• Repair of roadways, ie. "tearing" and reinforcement from asphalt recyclate

• Exchange of curb fittings for a monolithic drainage gutter including grid adjustment of existing inlets

• Cleaning of drainage devices (longitudinal ditches, passes)

• Deleting the ramp-up greenery, creating a fixed obstacle to traffic



The total length of the D10 - Stage 1 is 3.390 km.

COLAS News

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Apr 1

Change of COLAS CZ, a.s. BOD members

With effect from 1 April 2021, the statutory body of COLAS CZ, a.s. is the following company BOD.

Feb 26

COVID-19 - we respond to the current development of the pandemic

We care about the health of our employees and try to do our best to protect them as much as possible at this time!

Jan 8

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

Dec 27

COLAS CZ realizes D48 Bělotín - Nový Jičín project

ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved