R10 right-hand lane Radonice – Hlavenec (stage 1), Tuřice – Benátky

The project addresses modernization of the right-hand traffic lane of the R10 expressway.

Construction period: 2018/04 - 2018/06
Total value of the contract: 71 062 753 CZK excluding VAT

The works involve:

• Reconstruction of the R10 motorway right-lane in km 9,985 - 14,375 (replacement of cover layers including remediation of base layer cracks)

• Expansion of the road at the points of extension of the branch / connecting strip according to the ČSN standards including relocation of large-area traffic signs

• Restoring traffic signs and adding safety-enhancing features

• Restoring and completing the safety device on the right edge of the road

• Repair of roadways, ie. "tearing" and reinforcement from asphalt recyclate

• Exchange of curb fittings for a monolithic drainage gutter including grid adjustment of existing inlets

• Cleaning of drainage devices (longitudinal ditches, passes)

• Deleting the ramp-up greenery, creating a fixed obstacle to traffic



The total length of the D10 - Stage 1 is 3.390 km.

COLAS News

Jun 14

Biodiversity, the core theme of Colas Environment Day

On Thursday, June 9, Colas is holding its 2nd Environment Day across all its locations worldwide. This year, the event is dedicated to biodiversity, a major challenge for the Group, which launched a low-carbon and biodiversity strategy in 2020 to help preserve the planet.

Jun 6

Merger announcement - COLAS CZ, a.s. and Silnice Žáček, s.r.o. have merged

As of 31 May 2022, the merger of Silnice Žáček s.r.o., as the merging entity dissolved without liquidation, and COLAS CZ a.s., as the surviving entity, became effective.

Mar 16

Fiscal Year 2021 of the Group

The Board of Directors of Colas met to finalize the 2021 financial statements

Feb 23

Colas joins the #StOpE initiative to end everyday sexism in the workplace

On January 25, 2022, the Colas Group, represented by Frédéric Gardès, Chairman and CEO, joined #StOpE, an initiative dedicated to combatting so-called “everyday” sexism in the workplace. Colas is the first company in the construction sector to sign on to the program.

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved