Puklice sewerage system and wastewater treatment plant
The project involved the construction of a gravity sanitary sewerage system in the towns of Puklice and Studénky.
Construction period: | 2014/09 - 2015/09 |
---|---|
Total value of the contract: | 89 422 446 CZK excluding VAT |
The project for the 9,032 m system also included repairs to the surface of regional and local roads and the construction of a new mechanical-biological wastewater treatment plant with technological equipment and a capacity of 1,000 population equivalents.