Pavement along road II/163 – Vyšší Brod
Reconstruction of a road through the town involved the extension of the road by wire mesh stone mattresses.
Construction period: | 2014/05 - 2014/10 |
---|---|
Total value of the contract: | 15 555 954,85 CZK excluding VAT |
The work also included retaining structures - gabion walls and securing a rock massif with wire mesh and anchors.