Luka nad Jihlavou, construction of sewerage system

Construction of the sewerage system and reconstruction of the rainwater drainage in the Čs. Armády, Zahradní, Polní, Nová, Revoluční, Družby, Lidická and Školní streets with connection to the existing sewerage in Luka nad Jihlavou municipality

Construction period: 2018/10 - 2020/10
Total value of the contract: 42 352 758 CZK excluding VAT

- Stage I - sewerage system: 1,461.94 m, rainwater drainage: 1,317.22 m, house connections: 325.60 m, rainwater connections: 32.00 m

- Stage II - sewerage system: 1,664.62 m, rainwater drainage: 899.00 m, house connections: 632.70 m, rain connection: 353.00 m

- repairs of roads and paved areas

- relocation of engineering networks

- extension of the sewerage system to the part of Úvoz Street in Luka nad Jihlavou, reconstruction of the waterworks at the junction of the streets

- tree protection - linden tree (throughout the construction), including written evaluation of the tree condition and execution of a tree operation for the purpose of its remediation, including measures to ensure safe movement around the tree and safety for roadways and networks in its vicinity.

 

The construction is executed in the form of 
the consortium of companies COLAS CZ (a member of the consortium). and VHST (50% - 50%)

 

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved