The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.
Construction period: | 2020/09 - 2021/12 |
---|---|
Total value of the contract: | 121mil CZK |
Contractor: | COLAS CZ |
The scope of works also includes the demolition of the original bridge, and the construction of a temporary footbridge and large retaining walls on both banks of the Sázava River. In addition, COLAS CZ equiped the bridge with street lights and cover a large part of its concrete surfaces with stone cladding, which will help turn this construction project into an important architectural element.