III/28211 Klokočí - Rohliny
Reconstruction of the 3.5 km long roadway.
Construction period: | 2018/06 - 2018/07 |
---|---|
Total value of the contract: | 14 932 637 CZK excluding VAT |
The subject of the project is milling of the existing cover, local redevelopment of the subsoil, construction of leveling and new asphalt formation, repairs of passes, ditch cleaning, construction of shoulders. New horizontal and vertical traffic signs were installed.