III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.

Construction period: 2016/08 - 2017/07
Total value of the contract: 21 250 000 CZK excluding VAT

It is a road with high tourist traffic to Kost Castle located in the protected landscape area of Bohemian Paradise and the urban monument zone of Sobotka, Vesec u Sobotky and Podkost.

The construction will proceed under full closure in two stages. In 2016, a stretch from the intersection of route III/27935 and route III/29730 (the Libošovice direction) to Podkost will be executed. In 2017, a stretch from Sobotka to the intersection of route III27935 and route III/29730 (the Libošovice direction) will be executed.

Works to be implemented:

-          application of asphalt layers: 6,062.0 t

-          reconstruction of culverts: 296.5 m

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved