III/27935 Sobotka – Podkost
Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.
Construction period: | 2016/08 - 2017/07 |
---|---|
Total value of the contract: | 21 250 000 CZK excluding VAT |
It is a road with high tourist traffic to Kost Castle located in the protected landscape area of Bohemian Paradise and the urban monument zone of Sobotka, Vesec u Sobotky and Podkost.
The construction will proceed under full closure in two stages. In 2016, a stretch from the intersection of route III/27935 and route III/29730 (the Libošovice direction) to Podkost will be executed. In 2017, a stretch from Sobotka to the intersection of route III27935 and route III/29730 (the Libošovice direction) will be executed.
Works to be implemented:
- application of asphalt layers: 6,062.0 t
- reconstruction of culverts: 296.5 m