The construction of the stretch in the above-mentioned range includes complete construction of the road layers, incl. subsoil adjustments. It also includes replacement of the pavement frames affected by the construction, restoration of the horizontal marking and the width adjustment of the road at the site of the existing pedestrian crossings. At the end of the modification, the existing roadway will be expanded within the road body. Outside the built-up part, the cold-recycling of the road will be carried out with the modification of longitudinal and transverse inclines (elevation of the level). Clearing of existing culverts also forms part of the project. Culverts in poor technical condition will be replaced by new pipe culverts with sloping prefabricated ditches.