III/2098 Modernization of the road through Loučky
Modernization of road III/2098 through Loučky u Nového Sedla including modernization of bridge Reg. No. 2098 -1.
Construction period: | 2014/03 - 2014/12 |
---|---|
Total value of the contract: | 10 329 099 CZK excluding VAT |
The total length of the modernized part of route III/2098 was 0.968 km. The whole roadway structure was removed in km 0.000 – 0.565 in a total area of 4,702 m2; in km 0.595 – 0.968 only the wearing course was replaced in a total area of 2,424 m2, with local levelling of the asphalt base course. The work included drainage of the road, traffic signs and protection of the HV power line. The bridge modernization involved replacement of the interlocking slab, insulation, bridge parapets and structural layers of the road on the bridge including safety equipment.