III/0164 Řepov – through road
The project documentation contains the construction of the III/0164 road at the through road of the village of Řepov in the length of approx. 1,250 m.
Construction period: | 2017/10 - 2018/08 |
---|---|
Total value of the contract: | 24 969 373 CZK |
It involves the entire section of the traffic station of this road.
The construction of the stretch in the above-mentioned range includes the complete construction of the road layers, incl. subsoil adjustments. It also includes replacement of pavement curbs affected by the project, the restoration of the horizontal marking and the width adjustment of the roadway in place of the existing pedestrian crossings. At the end of the construction changes, the existing roadway will be extended within the road body.