II/611 Nehvizdy - Mochov, reconstruction

The public tender concerned reconstruction of road II/611 between Nehvizdy and Mochov in a length of 3.273 km.

Construction period: 2014/07 - 2015/04
Total value of the contract: 27 426 697 CZK excluding VAT

The S 7,5/60 category road is a two-way, directionally undivided road in a rural area.

The contract also included reconstruction of a bridge, Reg. No. 611-003 in the length of 10.676 m and reconstruction of an intersection of routes II/611 and II/245, which was rebuilt into a roundabout in the external diameter of 39 m.

Attachments

COLAS News

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved