II/464 Mošnov – reconstruction (III/4809)

This project involves the construction of a specific segment of the II/464 road in the cadastral territory of Sedlnice and Mošnov.

Construction period: 2016/09 - 2016/09
Total value of the contract: 28 232 755 CZK excluding VAT

The start of the given roadway extension section is at the existing II/464 road at the turn-off to the Sedlnice railway station with the end of the roadway extension section at the existing III/4809 road beyond the new ČEZ transformer station, and a future connection to the proposed extension to the III/4809 road in the “I/58 Mošnov – bypass road” project. The project includes the reconstruction of the asphalt layers of the III/4809 road in the section from the end of the II/464 road extension to the connection to the I/58 road. The existing II/464 and III/4809 roads border the Mošnov industrial zone to the south and the Cepro a.s. fuel storage facility is located nearby along with the COLAS CZ, a.s. hot-mix plant.

COLAS News

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved