II/430 Rousínov – Tučapy
The project involved the reconstruction of existing road II/430 in a length of 5.554 km
Construction period: | 2014/08 - 2015/09 |
---|---|
Total value of the contract: | 86 799 859 CZK excluding VAT |
The project involved the reconstruction of existing road II/430 in a length of 5.554 km, including the replacement of the asphalt surface with an overall strengthening of the road structure, the repair of failures and the construction of a roundabout intersection in Rousínov.
Attachments
- II/430 Rousínov – Tučapy - referenční list (PDF, 463kB)