II/405 Zašovice - Okříšky
Complete reconstruction of a class II, S 9,5 category road in a length of 1.9 km.
Construction period: | 2013/04 - 2014/05 |
---|---|
Total value of the contract: | 107 695 715 CZK excluding VAT |
- Earthworks: 70,000 m3 of excavations, 88,000 m3 of embankments
- Tunnel-type bridge from corrugated sheets
- Slope reinforced by the Green Slope system
- Total area of asphalt surfaces: 16,000 m2
- Soundproofing wall
- Retention wall from gabions