II/405 road through Zašovice
Reconstruction of the class II road in a length of 1,300 m.
Construction period: | 2014/03 - 2014/12 |
---|---|
Total value of the contract: | 16 240 473,78 CZK excluding VAT |
Reconstruction of the class II road in a length of 1,300 m involved milling of the old asphalt cover, extension of the roadway, cold recycling of the existing base courses and laying of a new system of asphalt courses. 800 m2 of pavement and 1,000 m of kerb were installed and the old sewerage system in Zašovice was reconstructed.
Attachments
- II/405 Zašovice – průtah - referenční list (PDF, 373kB)