II/400 Hostim - Rozkoš
The reconstruction of the road involved the repair of potholes and depressions and the subsequent strengthening of the surface with a 10 cm layer of asphalt-concrete.
Construction period: | 2013/10 - 2013/12 |
---|---|
Total value of the contract: | 2 671 961 CZK excluding VAT |
The total area of the roads covers 3,430 m2.