II/362 Nyklovice - Jižní Morava region borderline, stage III

Reconstruction of the roadway using cold recycling technology has been proposed at the site where a layer of existing roadway material is added with the addition of cement binder.

Construction period: 2018/06 - 2018/10
Total value of the contract: 32 699 023
Prior to recycling, remediation of the underlying layers and ground floor in the area of the roadside will be carried out. On the recycled layer, a new cover of 110 mm thick compacted asphalt layers will be made.

An essential part of the construction is restoration of the functionality of the drainage systems throughout the whole section, which includes the reconstruction of the culverts, cleaning, ditching and reinforcement of the ditches, drainage piping construction, cutting trees growing in the ditches as well as on the roadsides and adjusting the economic exits.

- SO 103 Nyklovice -  II/388 crossroad in the length of 2719 m

- SO 113 Restoration of the II/362 road drainage 

 
 
 
 
 

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved