II/279 Horní Bousov – Dolní Bousov - road reconstruction
This project involved the modernisation of the II/279 second-class road section between the towns of Horní Bousov and Dolní Bousov.
Construction period: | 2015/07 - 2015/10 |
---|---|
Total value of the contract: | 23 539 733 CZK excluding VAT |
Roadway modernisation involved replacing the road surface layer and the existing substandard ditches. This road is a part of the road network in the Central Bohemian Region.
The modernised section was approximately 3.0 km long. The road itself was a two-lane undivided road in the S 6.5/50 category. Approximately 2.0 km of the road was located in rural areas. 1 km was located in the town of Dolní Bousov. The road section in town was partially lined with kerbs and 0.5 m-wide unpaved hard shoulders. The road was lined with 0.75 m-wide unpaved hard shoulders and 1.5 m-wide shoulders where guardrails were installed. The width of the lane of travel varies and fluctuates outside of town at 2.75 m and 2.75 m or 3.25 m in town. An existing culvert was reconstructed at approximately km 1.860.