II/279 Horní Bousov – Dolní Bousov - road reconstruction

This project involved the modernisation of the II/279 second-class road section between the towns of Horní Bousov and Dolní Bousov.

Construction period: 2015/07 - 2015/10
Total value of the contract: 23 539 733 CZK excluding VAT

Roadway modernisation involved replacing the road surface layer and the existing substandard ditches. This road is a part of the road network in the Central Bohemian Region.

The modernised section was approximately 3.0 km long. The road itself was a two-lane undivided road in the S 6.5/50 category. Approximately 2.0 km of the road was located in rural areas. 1 km was located in the town of Dolní Bousov. The road section in town was partially lined with kerbs and 0.5 m-wide unpaved hard shoulders. The road was lined with 0.75 m-wide unpaved hard shoulders and 1.5 m-wide shoulders where guardrails were installed. The width of the lane of travel varies and fluctuates outside of town at 2.75 m and 2.75 m or 3.25 m in town. An existing culvert was reconstructed at approximately km 1.860.

 

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved