II/206 Rabštejn nad Střelou - Stvolny

Repair of road surface II/206 between Rabštejn nad Střelou and Stvolny in a total length of c. 2,363 m.

Construction period: 2015/08 - 2015/10
Total value of the contract: 8 095 868 CZK excluding VAT

The total area of the repaired asphalt courses in the road structure was 12,811 m2. 

The construction was divided into two sections; section 1 in the village of Stvolny, where the roadway was milled to the depth of 50 mm and a new asphalt wearing course ACO 11S was laid in a thickness of 50 mm in the area of c. 620 m2; section 2 between Rabštejn nad Střelou and Stvolny, where the roadway was milled to the depth of 40 mm, the non-supporting areas were locally repaired, a levelling layer of ACP 16S was applied together with geogrid reinforcement in an area of 2,600 m2, a new asphalt base course of ACP 16S was laid in a thickness of 60 mm and an asphalt wearing course ACO 11 S in a thickness of 50 mm in the area of 12,191 m2 was laid. The construction included the repair of the existing culvert from gabions, the installation of a new handrail in a total length of 26 m, reinforcement of verges by crusher run material, the cleaning of road ditches in the entire length, the necessary modification of the exit to the adjoining plots from the milled material and implementation of a new horizontal road marking in an area of 653 m2.

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved