II/169 Horská Kvilda - repair

Repair of the road II/169 was executed in the urban area of Horská Kvilda between the signs indicating the beginning and end of the town.

Construction period: 2015/09 - 2015/10
Total value of the contract: 10 770 687 CZK excluding VAT

The project included the reconstruction and extension of the road embankment in a length of 120 m. The total length of the reconstruction is 2,185 m and the total area of repaired asphalt courses is 13,037 m2. 

The road was milled in the entire section to the depth of 100 mm and the non-supporting areas were locally repaired. Then, a new ACL 22+ base course was laid in a thickness of 60 mm and the wearing course ACO 11 S modif. was laid in a thickness of 40 mm. The project included the cleaning and paving of an existing culvert, reinforcement of shoulders in the entire length, replacement of old crash barriers with new barriers in a length of 86 m, installation of 90 roadside delineators with snow rods and the application of new horizontal marking in an area of 595 m2.

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved