II/150 Čechtice – Loket, reconstruction

The reconstruction of this road will homogenize and improve traffic safety and traffic flow. The reconstruction of the bridge structure was performed to increase its load rating.

Construction period: 2014/07 - 2015/08
Total value of the contract: 61 710 461 CZK excluding VAT

The asphalt roadway on the II/150 road was resurfaced between the towns of Čechtice and Loket over a total length of 7,490.0 m. The entire road was reconstructed, including the drainage system, in the urban parts of Čechtice and Křivsoudov. The protected landmark stone arch bridge in the town of Křivsoudov was also reconstructed. Bridge reconstruction was supervised by National Heritage Institute personnel and used original materials. The bridge over Alberovický Brook in the town of Alberovice was demolished and replaced with a new reinforced concrete monolithic framework bridge with a span of 4.5 m that complies with existing Czech technical standards and load-bearing requirements. A culvert in the urban part of Alberovice was reconstructed and a new sidewalk was built in Křivsoudov.

COLAS News

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Apr 1

Change of COLAS CZ, a.s. BOD members

With effect from 1 April 2021, the statutory body of COLAS CZ, a.s. is the following company BOD.

Feb 26

COVID-19 - we respond to the current development of the pandemic

We care about the health of our employees and try to do our best to protect them as much as possible at this time!

Navigation

© 2021 COLAS CZ, a.s. All rights reserved