I/62 road around former quarry, repair of the roadway

The I/62 road is the backbone of the Hřensko busy artery, its route lines the Elbe River.

Construction period: 2019/05 - 2020/05
Total value of the contract: 18 702 140 CZK excluding VAT
Contractor:COLAS CZ, a.s.

Construction parameters

I/62 roadway

Milling, laying of ACL 16+, ACO 11+                   21,308 m2

Horizontal road marking                                        2,005 m2

Static protection km 33

Pilots + steel beam height 160                                 228 m

Negative shoring                                                      224 m2

Micropiles incl. grouting                                            250 m

C30/37 (B37) concrete gravity wall                            45 m3

In this exposed area, without alternative bypasses, employees of COLAS CZ have already laid asphalt cover in a total volume of approx. 5,966 tons. Currently, work is being carried out on static securing of the slope by means of piles, micropiles and gravity wall.

COLAS News

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved