I/34 Božejov–Ondřejov–Pelhřimov

Construction of the Ondřejov and Ústrašín bypass on class I road 34 has continued in 2016 and is currently the largest new transport infrastructure project in the Vysočina region.

Construction period: 2015/04 - 2017/11
Total value of the contract: 467 600 000 CZK excluding VAT

The construction is being undertaken by a consortium of companies - Swietelsky stavební s.r.o., STRABAG a.s. and COLAS CZ, a.s. The leading company in the consortium – Swietelsky – has a 34 % share, COLAS CZ and Strabag have a 33 % share and our share in the price of the contract is then approx. CZK 148 million. Each of the mentioned companies is responsible for a section approximately 1.8 km long; COLAS CZ is responsible for the initial part bypassing the Ústrašín municipality, including the longest bridge in the project. Currently, earthworks and work on ancillary structures is being implemented together with final operations on bridge substructures. According to the schedule, the base course layers of asphalt concrete on the roads and all load-bearing structures and transitional areas on the bridges should be complete before winter.

 

Data:

Client: Road and Motorway Directorate of the CR, Administrative Centre Jihlava

Contractor: Božejov Consortium (Swietelsky stavební s.r.o., STRABAG a.s., COLAS CZ, a.s.)

Actual construction project price acc. to contract: CZK 467.6 million excl. VAT, of which COLAS’s share is currently CZK 155.6 mil.

Total volume of earthworks: excavations 314,888 m3, fills 301,378 m3

Main route length: 5,397 m, of which COLAS’s part is 1.8 km long.

Roadway area: 60,500 m2

Number of bridges: 9 with a total length of 211 m; three of them are steel, so-called tubosider bridges and the remaining structures are concrete bridges including the largest four-span bridge

Construction project start: April 2015

Commissioning: August 2017, completion: November 2017

 

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved