I/3 Mirošovice – Benešov, 2+1 configuration

The I/3 road is a major transport corridor of international importance connecting the south of Europe from the Adriatic Sea to northern parts of Europe and the Baltic Sea.

Construction period: 2016/07 - 2017/04
Total value of the contract: 74 820 840 CZK excluding VAT

This project involves the expansion of the existing I/3 road to add an additional lane of travel and to construct a new merging lane to increase safety. “Quiet” Microville asphalt will be used on wear layer of the asphalt road surfacing to reduce noise levels in the surrounding area. Work includes installation of a half-portal structure with an information panel for drivers. A gabion retaining wall structure and a space for telematics maintenance vehicles will be installed at the location of the half‑portal. Given the fact that the construction work on the I/3 road in the 1970s did anticipate the construction of a 4-lane road, the existing road is wide enough to add an additional lane of travel.

The project will result in partial closures on the road.

Contractor: "Company PORR + COLAS, I/3 Mirošovice - Benešov", Leading member of Consortium: Porr, a.s. (50%), Member of Consortium: COLAS CZ, a.s. (50%)

COLAS CZ a.s. will perform 10.6 km of the total 14.3 km of work on the road.

Planned work:

-          laying asphalt layers: 8,728.0 t

-          construction of gabion retaining wall: 482.0 m3

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved