I/27 Alžbětín - roundabout, bridge ev. No. 27-117

Construction period: 2019/08 - 2020/10
Total value of the contract: 27 300 000 CZK excluding VAT
Contractor:Consortium I/27 Alžbětín- COLAS a SMP (COLAS CZ a.s. construction units 101; 102; 110; 151; 401 and 801 + SMP CZ – construction unit 201)
  • Execution of a new three-arm roundabout behind the former customs house in the direction to Germany with a diameter of 35 m
  • Free shop parking lot (originally an access road at the northern facade of the former customs house)
  • Induced structural changes to existing utilities and public lighting
  • Reconstruction of the bridge No. 27-117

A new asphalt layer was laid in the entire section.

The stated area is located in the 4th nature protection zone of the Šumava Protected Landscape Area.

Operating station km: 185.918 - 186.272

I/27 width arrangement with a designed speed of 50 km/h in the MS2 20/9/50 category with a 3.5 m wide lane, 0.25 m guide strip and 0.25 m drainage strip. Road width between curbs 8 m.

Access road to the car park of the Free shop with a designed speed of 30 km/h with a width arrangement of a lane 2.75 m wide, a guide and drainage strip 0.25 m. The road width between the curbs 6 m.

Bridge No. 27-117: in addition to the asphalt layer, the substructure and supporting structure of the bridge have been repaired.

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved