Notice - change of the company's registered office - newly at Rubeška 215/1, 190 00 Prague 9

I/22 Draženov

The full-area repair of road I/22 involved the section from a roundabout and exit from road I/26, the road through the town and behind the Draženov town limit sign in a total length of 1,023 m.

Construction period: 2015/07 - 2015/08
Total value of the contract: 6 827 937 CZK excluding VAT

The total area of the asphalt course repair was 8,695 m2. 

The roadway was milled in the whole section to a depth of 90 mm and non-supportive spots were repaired. A new base course ACL 22 was laid in a thickness of 70 mm and a mastic asphalt carpet modified by SMA 11 S in a thickness of 40 mm with a coarsening surface from crushed aggregate coated by asphalt was applied. The construction included reinforcement of the shoulders, cleaning of the ditches and the application of new plastic horizontal marking in the entire length.

COLAS News

Jan 8

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

Dec 27

COLAS CZ realizes D48 Bělotín - Nový Jičín project

ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

Dec 16

D48 Rybí – Flyover Rychaltice motorway - opening to traffic

On December 15th, 2020, Directorate of roads and motorways opens to traffic the new motorway section D48 Rybí – Flyover Rychaltice.

Nov 2

Merger of Silnice Horšovský Týn a.s.

General Meeting of shareholders decided on the merger by merging the company COLAS CZ, a.s. (= successor business corporation) and the company Silnice Horšovský Týn a.s. (= defunct business corporations).

Oct 30

II/353 Velký Beranov - bypass opens to traffic

The most expensive road construction in the history of the Vysočina Region opens to traffic on the dot exactly according to the schedule set up last spring.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved