I/22 Draženov

The full-area repair of road I/22 involved the section from a roundabout and exit from road I/26, the road through the town and behind the Draženov town limit sign in a total length of 1,023 m.

Construction period: 2015/07 - 2015/08
Total value of the contract: 6 827 937 CZK excluding VAT

The total area of the asphalt course repair was 8,695 m2. 

The roadway was milled in the whole section to a depth of 90 mm and non-supportive spots were repaired. A new base course ACL 22 was laid in a thickness of 70 mm and a mastic asphalt carpet modified by SMA 11 S in a thickness of 40 mm with a coarsening surface from crushed aggregate coated by asphalt was applied. The construction included reinforcement of the shoulders, cleaning of the ditches and the application of new plastic horizontal marking in the entire length.

COLAS News

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved