I/22 Draženov
The full-area repair of road I/22 involved the section from a roundabout and exit from road I/26, the road through the town and behind the Draženov town limit sign in a total length of 1,023 m.
Construction period: | 2015/07 - 2015/08 |
---|---|
Total value of the contract: | 6 827 937 CZK excluding VAT |
The total area of the asphalt course repair was 8,695 m2.
The roadway was milled in the whole section to a depth of 90 mm and non-supportive spots were repaired. A new base course ACL 22 was laid in a thickness of 70 mm and a mastic asphalt carpet modified by SMA 11 S in a thickness of 40 mm with a coarsening surface from crushed aggregate coated by asphalt was applied. The construction included reinforcement of the shoulders, cleaning of the ditches and the application of new plastic horizontal marking in the entire length.