I/15 Lovosice - Terezín, km 34.200 - 36.800

The project concerned repair of the road surface.

Construction period: 2014/08 - 2014/10
Total value of the contract: 16 390 084 CZK excluding VAT

The surface of road I/15 was repaired between the Prosmyky roundabout and the Terezín roundabout in a total length of 2,632 meters. The total area of the asphalt course repair was 22,635 m2. The road was milled to a depth of 110 mm along the entire section, the base course was locally reconstructed and the frost cracks were treated. Two new layers from modified asphalt-concrete ACL 16 S in a thickness of 60 mm and ACO 11S in a thickness of 50 mm were then laid. The construction also included filling of damaged slopes of the formation, repair of soft shoulder by filling with crusher run material, addition and replacement of roadside delineators and the application of new plastic horizontal marking.

COLAS News

Jan 8

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

Dec 27

COLAS CZ realizes D48 Bělotín - Nový Jičín project

ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

Dec 16

D48 Rybí – Flyover Rychaltice motorway - opening to traffic

On December 15th, 2020, Directorate of roads and motorways opens to traffic the new motorway section D48 Rybí – Flyover Rychaltice.

Nov 2

Merger of Silnice Horšovský Týn a.s.

General Meeting of shareholders decided on the merger by merging the company COLAS CZ, a.s. (= successor business corporation) and the company Silnice Horšovský Týn a.s. (= defunct business corporations).

Oct 30

II/353 Velký Beranov - bypass opens to traffic

The most expensive road construction in the history of the Vysočina Region opens to traffic on the dot exactly according to the schedule set up last spring.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved