I/14 Horní Sytová - Hrabačov
Reconstruction of a 3.3 km long roadway.
Construction period: | 2018/04 - 2018/06 |
---|---|
Total value of the contract: | 24 348 964 CZK excluding VAT |
The subject of the project is milling of the existing cover, construction of leveling and new asphalt formation, making a pavement with granite frames and asphalt cover. New horizontal and vertical traffic signs were installed.