D1 Renovation of carriageway D1 km 199.3 – 204.6 on the right

Renovation of the carriageway asphalt layer encompassed an overall area of 71,354 m2.

Construction period: 2016/07 - 2016/11
Total value of the contract: 165 401 538 CZK excluding VAT

The investor of the project is the Road and Motorway Directorate of the CR.

The construction project is being implemented by the “D1- 199 STRABAG+COLAS Consortium” of COLAS CZ, a.s. and STRABAG a.s. (50%/50%). The leading member of the consortium is STRABAG, a.s..

The construction project is under way. The original cement concrete layer of the carriageway is being removed and replaced by asphalt layers. In the parts of the carriageway with asphalt concrete surface the wearing course and the base course will be replaced, expansion joints and accessories on the bridges will be repaired, and further operations will be implemented, including modification of central reservation crossings, drainage system repairs, reinforcement of shoulders, restoration of safety elements, modification of SOS roadside service point surroundings, horizontal traffic markings and vertical traffic signs.

Unlike the construction project of the same section in 2015, the construction project includes work on the central reservation, including replacement of cabling and conduits, the drainage system and crash barriers, and replacement of tunnel fronts (5 pieces).

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved