Construction: road I/36 through Voleč – asphalt surface restoration

Route I/36 is the main road between Pardubice and Chlumec nad Cidlinou.

Construction period: 2007/10 - 2008/05
Total value of the contract: 23 570 632 CZK

The finished project I/36 Voleč – restoration of asphalt surface – was handed over on 6 May 2008. The handover was attended by representatives of the investor – the Road and Highway Directorate CR (ŘSD) Pardubice, Police of the CR, representatives of the transport department of the Pardubice Region, representatives of Voleč, Administration and Maintenance of the Roads in the Pardubice Region, the general designer and naturally representatives of the general contractor, Colas CZ, a.s. - the Pardubice centre.


The talks expressed the utmost satisfaction with the quality of the construction, operative approach and effort of the contractor, Colas CZ, a.s. - the Pardubice centre.


Route I/36 is the main road between Pardubice and Chlumec nad Cidlinou. The reason for the restoration of the asphalt cover was local damage of the roadway, which was in critical condition with numerous faults caused by the poor quality of the subbase course from concrete and granite cobbles.


The site was handed over by the customer, ŘSD CR – Pardubice to the contractor, COLAS CZ, a.s., in the 4th quarter of 2007.


The construction received an early usage permit at the end of 2007.



The finishing work was carried out on the site in 2008.

COLAS News

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Apr 1

Change of COLAS CZ, a.s. BOD members

With effect from 1 April 2021, the statutory body of COLAS CZ, a.s. is the following company BOD.

Feb 26

COVID-19 - we respond to the current development of the pandemic

We care about the health of our employees and try to do our best to protect them as much as possible at this time!

Jan 8

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

Dec 27

COLAS CZ realizes D48 Bělotín - Nový Jičín project

ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved