Construction: road I/36 through Voleč – asphalt surface restoration

Route I/36 is the main road between Pardubice and Chlumec nad Cidlinou.

Construction period: 2007/10 - 2008/05
Total value of the contract: 23 570 632 CZK

The finished project I/36 Voleč – restoration of asphalt surface – was handed over on 6 May 2008. The handover was attended by representatives of the investor – the Road and Highway Directorate CR (ŘSD) Pardubice, Police of the CR, representatives of the transport department of the Pardubice Region, representatives of Voleč, Administration and Maintenance of the Roads in the Pardubice Region, the general designer and naturally representatives of the general contractor, Colas CZ, a.s. - the Pardubice centre.


The talks expressed the utmost satisfaction with the quality of the construction, operative approach and effort of the contractor, Colas CZ, a.s. - the Pardubice centre.


Route I/36 is the main road between Pardubice and Chlumec nad Cidlinou. The reason for the restoration of the asphalt cover was local damage of the roadway, which was in critical condition with numerous faults caused by the poor quality of the subbase course from concrete and granite cobbles.


The site was handed over by the customer, ŘSD CR – Pardubice to the contractor, COLAS CZ, a.s., in the 4th quarter of 2007.


The construction received an early usage permit at the end of 2007.



The finishing work was carried out on the site in 2008.

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved