Construction of LINCOLN CZ - extension IV-VI
The project concerned the creation of paved surfaces and roads.
Construction period: | 2013/09 - 2014/05 |
---|---|
Total value of the contract: | 11 814 626 CZK excluding VAT |
The work included building new roads, parking spaces, an area for loading and unloading trucks and a retention wall from gabions on the premises of Lincoln CZ s.r.o. The volume of excavation was 9,840 m3. The foundation of roads and surfaces on unsuitable non-supportive sub-base was improved by the modification of the soil by a cinder stabilizer. The total area of the roads covered 6,500 m2, of which 5,380 m2 was concrete surfaces and 1,120 m2 concrete paving. The work also included the construction of a bus shelter in front of the company, Earthworks and horizontal marking.