Bypass Sokolov – Svatava, phase 3

The construction solves the bypass of the city of Sokolov and the municipality of Svatava.

Construction period: 2015/09 - 2016/03
Total value of the contract: 112 981 233 CZK excluding VAT

The construction solves the bypass of the city of Sokolov and the municipality of Svatava. The newly designed disposition will divert transit traffic from inhabited areas and reduce intensive traffic in the immediate centre. The road relocation starts with a passable branch (joining intersection) on road III/210 in front of the bridge structure SO 202 with a connection to the completed part. From the start of the section the route of the relocation leads over the bridge structure, crossing road III/210 29, the Sokolov - Svatava railway line, the Svatava River, and continues in an open line, first on the embankment with a length of 250 m. The road is category S9, 5/50. The minimal directional radius is 150 m, the maximum road ascent within the stage is 2.2%. The road composition is designed according to TP 170 for class III of traffic loading and the design level D0. The surface has a straight line camber of 2.5%, one-sided in bends.

 

Bridge characteristics across III/21029, the railroad and Svatava River:

The work involves the construction of a permanent road bridge with 7 spans and an upper roadway. Composite steel-concrete multispan continuous beam of constant height. Lower structure massive monolithic ferro-concrete pillars, massive ferro-concrete supports with parallel wing walls, deep foundation on piles.

Overbridge length: 295.5 m
Bridge length: 310.4 m
Span: 36 + 45 + 45 +45 + 45 + 45 + 36 m
Bridge height above rail surface: 6.56 m
Bridge height above rail surface: 5.25 m
Building height: 2.615 m
Free bridge width: 12.0 m
Bridge loading: endurance class A according to ČSN 73 6203

COLAS News

Jun 14

Biodiversity, the core theme of Colas Environment Day

On Thursday, June 9, Colas is holding its 2nd Environment Day across all its locations worldwide. This year, the event is dedicated to biodiversity, a major challenge for the Group, which launched a low-carbon and biodiversity strategy in 2020 to help preserve the planet.

Jun 6

Merger announcement - COLAS CZ, a.s. and Silnice Žáček, s.r.o. have merged

As of 31 May 2022, the merger of Silnice Žáček s.r.o., as the merging entity dissolved without liquidation, and COLAS CZ a.s., as the surviving entity, became effective.

Mar 16

Fiscal Year 2021 of the Group

The Board of Directors of Colas met to finalize the 2021 financial statements

Feb 23

Colas joins the #StOpE initiative to end everyday sexism in the workplace

On January 25, 2022, the Colas Group, represented by Frédéric Gardès, Chairman and CEO, joined #StOpE, an initiative dedicated to combatting so-called “everyday” sexism in the workplace. Colas is the first company in the construction sector to sign on to the program.

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved