Bypass Sokolov – Svatava, phase 3

The construction solves the bypass of the city of Sokolov and the municipality of Svatava.

Construction period: 2015/09 - 2016/03
Total value of the contract: 112 981 233 CZK excluding VAT

The construction solves the bypass of the city of Sokolov and the municipality of Svatava. The newly designed disposition will divert transit traffic from inhabited areas and reduce intensive traffic in the immediate centre. The road relocation starts with a passable branch (joining intersection) on road III/210 in front of the bridge structure SO 202 with a connection to the completed part. From the start of the section the route of the relocation leads over the bridge structure, crossing road III/210 29, the Sokolov - Svatava railway line, the Svatava River, and continues in an open line, first on the embankment with a length of 250 m. The road is category S9, 5/50. The minimal directional radius is 150 m, the maximum road ascent within the stage is 2.2%. The road composition is designed according to TP 170 for class III of traffic loading and the design level D0. The surface has a straight line camber of 2.5%, one-sided in bends.

 

Bridge characteristics across III/21029, the railroad and Svatava River:

The work involves the construction of a permanent road bridge with 7 spans and an upper roadway. Composite steel-concrete multispan continuous beam of constant height. Lower structure massive monolithic ferro-concrete pillars, massive ferro-concrete supports with parallel wing walls, deep foundation on piles.

Overbridge length: 295.5 m
Bridge length: 310.4 m
Span: 36 + 45 + 45 +45 + 45 + 45 + 36 m
Bridge height above rail surface: 6.56 m
Bridge height above rail surface: 5.25 m
Building height: 2.615 m
Free bridge width: 12.0 m
Bridge loading: endurance class A according to ČSN 73 6203

COLAS News

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

Navigation

© 2021 COLAS CZ, a.s. All rights reserved