Area reconstruction of communications in Kunratice municipality

The subject of the contract is the homogenization of the road construction layers.

Construction period: 2017/08 - 2018/05
Total value of the contract: 26 160 708 CZK excluding VAT

The project deals with the renewal of all construction layers of roads and entrances. The surface of communications in the affected area has shown a number of defects, in the form of local dips, flatheads, mosaic, longitudinal, transverse and network cracks. On the roadway, there are also deforestation defects in the form of asphalt cement loss and macro surface texture. Pavement renewal will begin by removing the existing 11 cm thick asphalt cover. In addition, the existing low-quality (fractured) concrete frames will be removed and new curbs will be installed, approximately in the existing position. The base layers will be extracted and taken to the landfill. New gravel structures will be reinforced by geogrids. The height solution is as close as possible to the current state. Any change in height may have an effect on drainage of communications as well as the deterioration of conditions for separate downhill exits to adjacent private land.

COLAS News

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Apr 1

Change of COLAS CZ, a.s. BOD members

With effect from 1 April 2021, the statutory body of COLAS CZ, a.s. is the following company BOD.

Feb 26

COVID-19 - we respond to the current development of the pandemic

We care about the health of our employees and try to do our best to protect them as much as possible at this time!

Navigation

© 2021 COLAS CZ, a.s. All rights reserved