II/104 Bridge over the Vltava river in Davle, reg. No. 104-001

The bridge in Davle municipality is situated at the confluence of the Vltava and Sázava rivers.

Construction period: 2017/09 - 2018/10
Total value of the contract: 66 151 092 CZK excluding VAT

The bridge leads the II/104 road via II/102 road, twice the local roads (Jílovská Street), the Vltava river and a railway line connecting the village of Jílové near Prague and the town of Davle. The supporting structure of the bridge is made up of a continuous beam of five fields, the first four of which are made of a chamber beam and the last, fifth one, is designed as a two-ramp structure.
Based on an extraordinary inspection in 2014, the under construction of the bridge was rated grade IV and the supporting frame grade VI (very poor). The aim of the reconstruction was therefore to improve the technical condition; construction of new supports, replacement of bridge seals and bearings as well as execution of a new joining plate, followed by replacement of the entire upper part of the bridge and accessories, rehabilitation of the supporting structure and modification of the internal parts of the chamber beam.
The extent of the work of the tender documents was determined on the basis of an extraordinary inspection and diagnosis of only one support, so implementation of a number of additional diagnostics was requested. They revealed a strong occurrence of alkaline-silica reaction in all concrete structures and very low resistance of concrete to chemical de-icing agents and watertightness. For this reason, the abutments had to be replaced almost completely, including replacement of several non-functional bearings, and the remediation had to be solved as waterproof and vapor-permeable to prevent the ingress of moisture into the structure.

Contractor: Most v Davli CCZ-Firesta represented by COLAS CZ as a leading member of consortium  and FIRESTA - Fišer, rekonstrukce, stavby

Construction period: 9/2017 - 10/2018, during the winter break from December to March the bridge was provisionally put into operation only in one lane

Bridge length: 280.83 m

Length of span: 262.96 m (57 + 80 +62 + 36 + 26.6)

Bridge height: 6 to 18 m

Bridge width: 12.4 m

COLAS News

Jun 18

Ceremonial opening of the workshop in Jihlava

On June 16th, 2020, the workshop in Jihlava was ceremoniously opened as part of the COLAS Group top management visit.

Jun 16

COLAS is building the road infrastructure for the future mobility development center in the Czech Republic

Colas CZ is currently building the road infrastructure for the Future Mobility Development Center in the western Czech city of Sokolov for the BMW group, as part of a joint venture with Colas Projects.

Jun 15

The most successful construction of road management in the Pardubice region

Reconstruction of the III/322 25 road Černá u Bohdanče I. stage, was nominated in The most successful projects competition. The project was carried out by the Pardubice region under the leadership of J. Neradílek (regional manager), together with Bauser CZ, a.s.

May 11

Change of company headquarters

As of 11 May 2020, a decision was taken by the Board of Directors to change the registered office of COLAS CZ. We look forward to seeing you at the company's new headquarters at Rubeška 215/1, 190 00 Prague 9 - Vysočany.

Apr 29

COLAS CZ buys Silnice Žáček s.r.o.

The family company Silnice Žáček s.r.o. is a major regional player based in Česká Lípa.

Apr 9

Reconstruction of the Roosevelt´s bridge in Pilsen

It is a very important vault bridge in Pilsen which was built between 1848 - 1850. More information about the completion of the first stage published in the Silnice železnice (Roads and Railways) magazine Road Railway attached below.

Navigation

© 2020 COLAS CZ, a.s. All rights reserved