II/104 Bridge over the Vltava river in Davle, reg. No. 104-001

The bridge in Davle municipality is situated at the confluence of the Vltava and Sázava rivers.

Construction period: 2017/09 - 2018/10
Total value of the contract: 66 151 092 CZK excluding VAT

The bridge leads the II/104 road via II/102 road, twice the local roads (Jílovská Street), the Vltava river and a railway line connecting the village of Jílové near Prague and the town of Davle. The supporting structure of the bridge is made up of a continuous beam of five fields, the first four of which are made of a chamber beam and the last, fifth one, is designed as a two-ramp structure.
Based on an extraordinary inspection in 2014, the under construction of the bridge was rated grade IV and the supporting frame grade VI (very poor). The aim of the reconstruction was therefore to improve the technical condition; construction of new supports, replacement of bridge seals and bearings as well as execution of a new joining plate, followed by replacement of the entire upper part of the bridge and accessories, rehabilitation of the supporting structure and modification of the internal parts of the chamber beam.
The extent of the work of the tender documents was determined on the basis of an extraordinary inspection and diagnosis of only one support, so implementation of a number of additional diagnostics was requested. They revealed a strong occurrence of alkaline-silica reaction in all concrete structures and very low resistance of concrete to chemical de-icing agents and watertightness. For this reason, the abutments had to be replaced almost completely, including replacement of several non-functional bearings, and the remediation had to be solved as waterproof and vapor-permeable to prevent the ingress of moisture into the structure.

Contractor: Most v Davli CCZ-Firesta represented by COLAS CZ as a leading member of consortium  and FIRESTA - Fišer, rekonstrukce, stavby

Construction period: 9/2017 - 10/2018, during the winter break from December to March the bridge was provisionally put into operation only in one lane

Bridge length: 280.83 m

Length of span: 262.96 m (57 + 80 +62 + 36 + 26.6)

Bridge height: 6 to 18 m

Bridge width: 12.4 m

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved