II/104 Bridge over the Vltava river in Davle, reg. No. 104-001

The bridge in Davle municipality is situated at the confluence of the Vltava and Sázava rivers.

Construction period: 2017/09 - 2018/10
Total value of the contract: 66 151 092 CZK excluding VAT

The bridge leads the II/104 road via II/102 road, twice the local roads (Jílovská Street), the Vltava river and a railway line connecting the village of Jílové near Prague and the town of Davle. The supporting structure of the bridge is made up of a continuous beam of five fields, the first four of which are made of a chamber beam and the last, fifth one, is designed as a two-ramp structure.
Based on an extraordinary inspection in 2014, the under construction of the bridge was rated grade IV and the supporting frame grade VI (very poor). The aim of the reconstruction was therefore to improve the technical condition; construction of new supports, replacement of bridge seals and bearings as well as execution of a new joining plate, followed by replacement of the entire upper part of the bridge and accessories, rehabilitation of the supporting structure and modification of the internal parts of the chamber beam.
The extent of the work of the tender documents was determined on the basis of an extraordinary inspection and diagnosis of only one support, so implementation of a number of additional diagnostics was requested. They revealed a strong occurrence of alkaline-silica reaction in all concrete structures and very low resistance of concrete to chemical de-icing agents and watertightness. For this reason, the abutments had to be replaced almost completely, including replacement of several non-functional bearings, and the remediation had to be solved as waterproof and vapor-permeable to prevent the ingress of moisture into the structure.

Contractor: Most v Davli CCZ-Firesta represented by COLAS CZ as a leading member of consortium  and FIRESTA - Fišer, rekonstrukce, stavby

Construction period: 9/2017 - 10/2018, during the winter break from December to March the bridge was provisionally put into operation only in one lane

Bridge length: 280.83 m

Length of span: 262.96 m (57 + 80 +62 + 36 + 26.6)

Bridge height: 6 to 18 m

Bridge width: 12.4 m

COLAS News

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Sep 22

Repair of overpass over Chlumecká Street on Prague Ring Road

Two new bridges will replace obsolete overpass in eastern part of metropolis

Aug 31

Aquisition of the Finnish company Destia

Colas signs an agreement to acquire Destia, a major player in the road and rail markets in Finland

Aug 31

2021 Half-Year Results of the group Colas

The Board of Directors of Colas, chaired by Frédéric Gardès, met on August 24, 2021 to approve the financial statements at June 30, 2021 and outlook for the current year.

Aug 9

Paris Olympic Games 2024: Colas wins a contract for logistic flow management

Mobility by Colas, the Colas Group’s digital mobility services integrator and operator, has signed a framework contract with the Olympic Structure Delivery Company (SOLIDEO) to design, roll out and operate "last mile" logistic flows for a minimum of 15 months, using the Qievo solution.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved