I/34 Božejov–Ondřejov–Pelhřimov
Complete construction of a pre-stressed solid structure with a span of 29.500 m, pile foundation.
Construction period: | 2015/04 - 2017/11 |
---|---|
Total value of the contract: | 17 000 000 CZK excluding VAT |
Structure designation: SO 203.1.
Status: reinforcement of the load-bearing structure and installation of pre-stressing lines.