I/26 Plzeň, Letná bridges – serial no. 26-009..1 and 2

The project involves the gradual reconstruction of a pair of motorway bridges over the Úslava River along the main route out of the city centre in Plzeň on the D5 motorway exit.

Construction period: 2015/05 - 2016/12
Total value of the contract: 62 292 000 CZK excluding VAT

Demolition of the existing bridge structures was completed, followed by pillar demolition, which exposed the foundation structure. Repairs were made to the abutments, new pillars were installed on the original foundation structure and new bridge structures were erected. The project involves extensions to roughly 10 utility system networks. This required the construction of temporary structures. It was also necessary to move a gas main away from the bridge construction site, which resulted in the construction of a separate bridging structure between the bridges.

COLAS News

Jan 8

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

Dec 27

COLAS CZ realizes D48 Bělotín - Nový Jičín project

ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

Dec 16

D48 Rybí – Flyover Rychaltice motorway - opening to traffic

On December 15th, 2020, Directorate of roads and motorways opens to traffic the new motorway section D48 Rybí – Flyover Rychaltice.

Nov 2

Merger of Silnice Horšovský Týn a.s.

General Meeting of shareholders decided on the merger by merging the company COLAS CZ, a.s. (= successor business corporation) and the company Silnice Horšovský Týn a.s. (= defunct business corporations).

Oct 30

II/353 Velký Beranov - bypass opens to traffic

The most expensive road construction in the history of the Vysočina Region opens to traffic on the dot exactly according to the schedule set up last spring.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved