I/10 Mýtiny, bridge 10-078
The bridge taking the I/10 road through the confluence of the Mumlava and Milnice rivers, consists of two plain fields. The total length of the supporting structure is 71.5 m.
Construction period: | 2018/06 - 2018/10 |
---|---|
Total value of the contract: | 19 257 235 CZK excluding VAT |
The supporting structure is made up of eight pre-assembled pre-tensioned beams of 1.7 m height and the total width is 11.4 m. The terms of direction, the bridge is straight, its obliqueness is 75 °.
The subject of the work is replacement of the leveling plate, which will be newly coupled with the prefabricated beams. Furthermore, bridge accessories will be replaced, including expansion joints. The reconstruction also deals with the rehabilitation of the original beams and repairs of the bridge bearings. The bridge will also be newly fitted with eight reserve pillars placed between the ledge prefabricate and the supporting structure.