I/10 Mýtiny, bridge 10-078

The bridge taking the I/10 road through the confluence of the Mumlava and Milnice rivers, consists of two plain fields. The total length of the supporting structure is 71.5 m.

Construction period: 2018/06 - 2018/10
Total value of the contract: 19 257 235 CZK excluding VAT

The supporting structure is made up of eight pre-assembled pre-tensioned beams of 1.7 m height and the total width is 11.4 m. The terms of direction, the bridge is straight, its obliqueness is 75 °.

The subject of the work is  replacement of the leveling plate, which will be newly coupled with the prefabricated beams. Furthermore, bridge accessories will be replaced, including expansion joints. The reconstruction also deals with the rehabilitation of the original beams and repairs of the bridge bearings. The bridge will also be newly fitted with eight reserve pillars placed between the ledge prefabricate and the supporting structure.

COLAS News

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Apr 7

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved